RM Analyzer Help

Selection list of construction schedules

A certain construction schedule from the list can be selected.

SettingDescription
All construction schedules (Option) If the option is selected, the recalculation is performed for all construction schedules in the required order (if the respective option is also set in the table of schedules). See also Schedule > Schedule Variants